Gas installation design in 24 hours

We will prepare for you a complete design of gas installation in 24 hours!
If we are to realize the project, the customer is obliged to deliver the set of required documents:
- technical specifications (conditions) for connecting to the gas grid – prepared by gas system operator.
- chimney sweep's opinion pointing possibility of connecting gas receiver to chimney (required in case of the existing building, not-required for the building under construction)
- building layouts (floors with gas receivers, including the proposed location of equipment),
- development plan with building location and proposed gas box location